125cc Sportsbikes Forum banner
1 - 20 of 145 Posts

· CBR125 Section SuperMod!
Joined
·
842 Posts
a mito 650
will be the shizzle
 

· Registered
Joined
·
94 Posts
work has stopped over the last few weeks came of my gsxr750 a couple of weeks ago not too bad a few grazes thank god i was slowing down

still waiting for the swarbrick exhausts
thats the problem with custom made items

will post new progress as soon as their in
will concentrate on the 250 version first as the 650 needs fuel injection modul thats in the process of being built and is in the last beta testing stage
 

· Registered
Joined
·
530 Posts
have you been waiting long for swarbrick to do your exhausts? has he got your bike in his workshop? im getting him to do mine but has been booked up till july (this was a couple of months ago)
cheers wallie
 

· 2 Strokes And I'm Happy
Joined
·
804 Posts

· Registered
Joined
·
1,005 Posts
what did it set you back getting the expasion chambers in sections ?

just im looking at getting a set of one off pipes done and was thinking of getting them in sections (to save time on a waiting list ) and weld them my self
 

· 2 Strokes And I'm Happy
Joined
·
804 Posts
most spannies are formed in pieces and welded together, if there not like that there hydroformed from one big sheet of metal.
 
1 - 20 of 145 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top